When I get home after a busy day, my favorite thing is to lie quietly in the bathtub and take a hot bath. The bathtub is closely connected with people's daily life. So what are the precautions for bathtub installation? In this issue, the editor will take Kohler Jacuzzi as an example to introduce the precautions for the installation of Kohler Jacuzzi. Follow the editor to understand

when I get home after a busy day, my favorite thing is to lie quietly in the bathtub and soak in a hot bath, which is closely connected with people's daily life. So what are the precautions for bathtub installation? In this issue, the editor will take Kohler Jacuzzi as an example to introduce the precautions for the installation of Kohler Jacuzzi. Follow the editor to understand

Kohler massage bathtub installation

Kohler has a history of more than 130 years, and is one of the most familiar bathroom brands in the world. Its most respected concept of home life is “ Elegant life ”, It gives people a sense of nobility

step 1: test whether the water leaks

install the drainage accessories before placing the bathtub, and close the water for 24 hours to see if there is water leakage in the bathtub. Pay special attention to the overflow. It is difficult to close the water for 24 hours. Pour two buckets of water outside the bathroom and try a good bathtub to drain the water. This is more convenient

when it comes to the actual installation, directly lift the bathtub into the bathroom and put it in the water position. Because the mixing position of the faucet left during the water change is just the width of the bathtub. If the size of the bathtub and the mixing water are not exactly the same, you should pay attention to that the center point of the bathtub should be facing the center point of the mixing water, otherwise it will be very ugly after installing the mixing faucet in the future

precautions for bathtub installation

after the bathtub is carried into the bathroom, start installing plumbing accessories, fill the bathtub with water, turn off the plumbing, and check whether there is water leakage. When the water overflows the overflow, the water in the bathtub flows out of the overflow. At this time, touch the back of the overflow to see if there is water leaking from here. After the overflow test is passed, then check the tightness of the water, choose the method of standing, and observe the tightness of the water

step 2: level the bathtub

when placing the bathtub, pay attention to that the other end of the water outlet should be slightly higher than the end of the water outlet, so that the sewage discharge is not smooth in the future. This depends on the situation. It was observed that there was a drainage slope at the bottom of the bathtub. After leveling the four sides of the bathtub with a level, the water was put into the test. As expected, the water was quickly drained. The bathtub visually maintains a horizontal beauty without affecting the drainage effect

step 3: sand filling

although the cast-iron bathtub is solid, its thermal conductivity is very fast. You should use Zhonghe sand to lay firmly and smash the bottom of the bathtub. Bricklayers also suggest using foam. Considering that foam is not as fluid as river sand, it is very suitable to fill all voids. In the process of filling river sand, how to prevent sand from leaking into the sewer is a problem to be solved

after all the placing work is completed, conduct a water discharge test again (this step is mainly to ensure that the water in the rear moving bathtub does not leak). After confirmation, wait for the bricklayer to build the skirt

step 4: leave access openings

there is a hole 300 mm high and 400 mm wide at the water inlet. Cut an opening according to the size, cut the wood board (40 mm thick) that has been waterproof and anti-corrosion treated according to the size, and stick the bricks on the wood board with 903 building glue according to the calculated number and arrangement of bricks on the board. Apply sealant on the edge of the protruding brick and inlay it on the box. This is to facilitate the maintenance of the bathtub drainage system in the future. When building the bathtub skirt, for the sake of aesthetics, all the height of 600 is reserved, and mosaic and other materials are abandoned. The bathtub skirt uses the same bricks as the lower part of the wall tiles. In this way, the lower wall tiles, floor tiles and bathtub skirt are all made of one color and one material, which is very beautiful

step 5: tiling

the tiling of the bathtub skirt does not need to scratch. Build a red brick table, plaster a layer of cement mortar on the surface, and then wait two days to tiling again. Tiling is very troublesome. Because the ground has a slope, and the bathtub is flat, each big brick should be polished into different sizes. It is not allowed to polish a lot at one time. It is easy to grind a lot, and it needs to be grinded repeatedly. The upper edge of the brick should be stuffed under the round edge of the bathtub, so that it will not form an external corner